Planning-grade figures · Plant sites under evaluation · Updated October 2026
American manufacturing · American-owned

Built on
American iron.
Wound by
American hands.

Eyerly Electrics is building a network of U.S. transformer plants, from the distribution units on every street to the large power transformers at the heart of the grid. Our supply chain is screened for China, Russia, Iran and North Korea at every tier.

See the build-out
Plant networkSites under evaluation
MODEL PLANT / 3DINTERACTIVE
RAIL SPURONE-WAY FLOW · RECEIVING → TEST → SHIPPINGTEST BAY
Orbit, walk the floor, fly through, or follow a build
128 wksAverage lead time,
power transformers
~80%U.S. power transformers
imported
30%U.S. power transformer
supply deficit, 2025
~$975M

Four-plant national build-out

Planning estimate · see the model below
4 plants

Two power-transformer, two distribution

Sites under evaluation
~2,660

Direct manufacturing jobs

At full production rate
0%

Adversary-nation content

Target, verified at every tier
01 / Why now

The grid runs on transformers.
America imports them.

Every kilowatt passes through a transformer at least twice on its way to a home, a data center or a factory. Demand has more than doubled since 2019, but U.S. production has not kept up, so utilities wait years for units built overseas.

~80%

of U.S. power transformers are imported, along with about half of distribution transformers.

Wood Mackenzie, Aug 2025
128 wks

average lead time for a power transformer. Generator step-up units run 144 weeks.

Wood Mackenzie Q2 2025 survey
+116%

growth in U.S. power-transformer demand since 2019. Distribution demand is up 41%.

Wood Mackenzie, Aug 2025
160–260%

more distribution-transformer capacity the U.S. could need by 2050, relative to 2021.

NREL, 2024

The competition is already
inside the fence.

In 2025 a transformer maker headquartered in China opened a plant in Texas. Months later it underbid U.S. suppliers on a municipal tender by 20–30%.

The gap in the rules

Buy American and Build America, Buy America test where a product is made and how much of its cost is domestic. Neither asks who owns the maker. A Chinese-owned plant on U.S. soil can pass both.

Why it is a grid question

Distribution transformers sit at every service point and stay in place for 30–40 years. Who builds them is a long-dated position in U.S. critical infrastructure, taken one tender at a time.

What we offer instead

A U.S.-owned manufacturer whose suppliers are screened for links to China, Russia, Iran and North Korea, covering materials, ownership, financing, logistics and sub-tier suppliers.

02 / What we build

Start with the street.
Scale to the substation.

We start with the distribution transformers utilities order by the thousand, then build up to the medium- and large-power units that carry the grid. Every unit is built to IEEE standards and DOE efficiency rules, and tested before it ships.

37.5 KVA PAD-MOUNT / EXPLODED VIEWDRAG TO ROTATE
Select a part

Inside a pad-mount

Drag the slider to open the unit up, then select a part to see what it does. This 37.5 kVA single-phase, loop-feed unit is our first engineering design: 24.9 kV primary, 120/240 V secondary, copper windings, and a step-lap core of grain-oriented electrical steel.

Engineering study37.5 kVA pad-mount
Efficiency99.156% at 50% load · meets DOE 2016 and 2029 rules
Core0.23 mm Hi-B grain-oriented steel, step-lap
WindingsCopper only
Testing12 routine tests on every unit · IEEE C57.12.90

Preliminary engineering study. Units are certified and approved by the buying utility before sale.

DISTRIBUTION · SMALL

Pole & pad, single-phase

25–167 kVA

Residential and light-commercial service, and the storm reserves every utility keeps on hand.

DISTRIBUTION · MEDIUM / LARGE

Three-phase pad-mount

150 kVA–2.5 MVA

Data centers, oilfield pads and compression, commercial campuses and substations.

POWER

Medium & large power

Substation class up to 230–345 kV

Substation and generator step-up units, built at our power-transformer plants once they are running.

03 / The model plant

One plant design.
Built to repeat.

Every Eyerly plant follows the same one-way flow, from rail receiving to the high-voltage test bay and out to the customer. A standard layout means we can train crews, qualify equipment and open each new plant faster than the last.

MODEL PLANT / CONCEPT LAYOUT3D
RECEIVECUTSTACKWINDASSEMBLEDRYTANK FABFILLTESTSHIP RAIL SPUR
Concept layout · ~300,000 sq ft under roof12 stops
01

Cut & stack

Electrical steel is cut into step-lap laminations and stacked into cores.

02

Wind

Copper coils are wound, with paper and pressboard insulation laid in layer by layer.

03

Assemble

Cranes lower the coils over the core limbs to form the active part.

04

Dry

Heat and vacuum drive moisture out of the insulation.

05

Tank & fill

The active part is sealed in its tank and filled with oil under vacuum.

06

Test & ship

Every unit is tested, then painted and shipped by rail or truck.

04 / Supply-chain integrity

Screened at every tier.
Adversaries designed out.

Latin American or allied sourcing is not automatically clean, because state-owned firms from adversary nations hold major mining and port stakes across the hemisphere. So every input carries a control written into every purchase order, and every supplier is screened again whenever ownership changes.

0%Target adversary-nation content
Every tierMaterials, owners, lenders, logistics
Per unitSerialized origin file shipped with each unit
InputWhere it comes fromControl on every purchase order
Electrical steelU.S. and allied mills; a second domestic source is expected in about two yearsMill test certificate for each heat; mill ownership screened
Copper conductorU.S. and allied producersMine-of-origin certificate; mines under adversary-state ownership excluded
Bushings, tap changers, fusesEuropean and U.S. manufacturersCountry-of-origin certificate by part number
Insulation, oil, gaskets, fastenersU.S., allied and Americas suppliersSub-tier verification certificate
PartnersManufacturers, mills, forwarders, ports, lendersOwnership, financing and control screened; repeated on any change
Final testEyerly, U.S.IEEE C57.12.90 routine tests; customer-witnessed QA; serialized origin file
Now · Bridge

Deliver now

Units are built by an allied manufacturing partner in the Americas, using IEEE-standard designs and screened materials, then finished and tested in the U.S. The partner has already supplied about 2,000 units to a single U.S. buyer in one year.

Origin: allied, screened
Next · Bridge+

Wind in America

Coil winding moves to the U.S. Under customs law, origin follows the most significant manufacturing step, and for a transformer that step is the core and coil.

Origin: U.S. (with a binding customs ruling)
Then · Build

Made in America

Our plants cut and stack cores, wind coils and test every unit in the U.S. A second domestic electrical-steel source completes the chain in 24–36 months.

Origin: U.S. · Buy American eligible
05 / The build-out

What it takes to bring
transformer capacity home.

Two plant models make up the network. Distribution-transformer plants are retrofits of existing industrial buildings, so they can produce within months. Power-transformer plants add a high bay, heavy cranes and an impulse-test hall for large units. These are planning estimates, checked against recent U.S. plant announcements.

Build-out calculator

Set a budget.
See the network.

$1.0B
$150M$1B$1.85B

Plants are added in planned order, with distribution-transformer plants first because they can produce sooner. A shared engineering center and workforce academy ($45M, 60 jobs) comes with the second plant. Supported jobs use EPI's employment multiplier for electrical equipment manufacturing.

4Plants
2,660Direct jobs
7,480Supplier & community jobs supported

How the estimates compare

Recent U.S. transformer plant announcements cost $200,000–$550,000 per job. Our models come in at about $273,000 per job for distribution and $420,000 for power, because we plan to retrofit existing buildings wherever we can.

AnnouncementProductInvestmentJobsType
Eaton · Jonesville, SC (2025)Three-phase$340M700Retrofit, 861k sq ft
Hitachi Energy · South Boston, VA (2025)Large power$457M825New facility
Howard Industries · Mississippi (2025)Distribution$237M450Expansion
Siemens Energy · Charlotte, NC (2024)Large power$150M559New factory, existing campus
Prolec GE · Goldsboro, NC (2025)Medium power$140M330+New building, existing site
Eyerly distribution-transformer plantDistribution$150M550Retrofit
Eyerly power-transformer plantDistribution to large power$315M750New high bay

Sources: company and state economic-development announcements (2024–2025). Eyerly figures are planning estimates, not commitments.

06 / Where we will build

We are choosing sites.
Here is what we look for.

We have not secured a site yet. We are evaluating regions where rail, power, people and steel come together, and where an existing industrial building can be put back to work. Each plant brings hundreds of permanent manufacturing jobs to its community.

A building to restart

An existing 250,000–450,000 sq ft industrial building with high clear height, or 40–80 acres of pad-ready land.

Class I rail

Rail service, or a site ready for a spur. Large units and steel coils move by rail.

Heavy-haul roads

An interstate within a few miles, on a route cleared for heavy oversize loads.

Power on the fence line

15–25 MW of service with a substation nearby, enough for drying ovens, welding and high-voltage testing.

A manufacturing workforce

A deep industrial labor pool and a regional manufacturing heritage.

A training partner

A technical or community college with electrical and mechatronics programs, so we can train coil winders and test technicians locally.

Steel in, units out

Close to domestic electrical-steel supply or a deep-water port for shipping across the hemisphere.

Ready to move

Certified or shovel-ready sites, with state and local partners who can move quickly.

CANDIDATE REGIONS / SUPPLYSELECT A REGION
Power-transformer plantDistribution-transformer plantAlso evaluatingDomestic supply

Also under evaluation

Lehigh Valley, PA

Norfolk Southern and CSX, I-78 and I-476, with more than 700 manufacturers and 40,700 manufacturing jobs.

Rocky Mount, NC

CSX's Carolina Connector intermodal terminal on I-95, with the Kingsboro CSX Select megasite nearby.

Chippewa Valley, WI

A state-certified business park with a 115 kV line on site, and a technical college that trains transformer technicians.

Great Lakes Bay, MI

I-75 and Saginaw River port access, about 30,000 manufacturing jobs, and Delta College mechatronics.

07 / Markets

Built for American demand.
Ready for the hemisphere.

Utilities, data centers and oilfield electrification are growing faster than U.S. capacity can serve them. Across the Americas, grids are being rebuilt after storms and years of underinvestment, and whoever supplies those transformers sets the equipment base for the next 40 years.

AMERICAS / RECONSTRUCTION LANESFROM U.S. GULF PORTS

U.S. utilities

Aging fleets, storm reserves and new service connections. Utilities replace or add 1.4–2.4 million distribution transformers every year.

1.4–2.4MDistribution units a year (NREL, via CRS)

Data centers

Each 100 MW campus phase needs about 50 large pad-mounts, and three-phase pad-mount demand is up roughly 77% since 2019.

24 → 110 GWU.S. data-center capacity by 2030 (Wood Mackenzie)

Oil & gas electrification

Compression, pads and processing are moving to grid power, and every new megawatt needs transformers to connect it.

11 → 26 GWPermian load, 2026–2038 (ERCOT)

Hemisphere reconstruction

Island grids hardening after storms, and nations restarting power systems for oil, mining and industry. Large units take more than two years to arrive, and today many come from China.

40 yrsService life of the equipment base being chosen now
08 / The staged plan

Deliver now.
Build as we grow.

We will not ask customers to wait for a factory. Screened units ship through our allied partner today, with U.S. content rising at each stage until every core and coil is made here. Timing is shown as targets.

Now

Bridge

Partner-built units, finished and tested in the U.S. against standing customer demand.

Next

Wind in the U.S.

Coil winding, dry-out and oil fill move to the U.S., making the units American-made.

Site + 9 months

First plant

The first distribution-transformer plant opens in a retrofit building and produces its first U.S.-made units.

Year 2

Large units

The first power-transformer plant brings medium- and large-power capability.

Months 24–36

Domestic steel

A second domestic electrical-steel source comes online for a U.S.-first bill of materials.

Years 3–4

Network

Four plants at full production, with about 2,660 direct jobs.

09 / The team

Operators, builders,
and veterans.

People who have built companies, factories and supply chains from nothing, now putting that experience to work for American manufacturing.

Leadership

Wade Eyerly
Wade Eyerly
FOUNDER & CEO

An entrepreneur who served a tour of duty in Iraq and worked for the U.S. Department of Defense. Wade co-founded Surf Air, founded Degree Insurance and leads Buko Ventures. He is building Eyerly Electrics to put transformer manufacturing back in American hands.

Surf AirCO-FOUNDEDDegree InsuranceFOUNDEDBuko VenturesLEADS
Dustin Jensen
Dustin Jensen
GROWTH

Dustin works on Eyerly’s commercial growth and supply chain. He has spent two decades taking early-stage companies from zero to scale in manufacturing, energy and industrial markets, including behind-the-meter power projects and an agricultural supply company he co-founded and sold. He is Chief Growth Officer and an equity partner at Monolith, a building-materials manufacturer, and co-author of ADAPT: A Strategic Methodology for AI Transformation. He has deep ties across the Caribbean and South America, and began his career as a U.S. Marine operator in Anbar Province, Iraq.

MonolithCGO & EQUITY PARTNERADAPTCO-AUTHORU.S. MarinesANBAR, IRAQ
Dan Kirk
Dan Kirk
PARTNERSHIPS

Dan leads Eyerly’s partnership efforts, including its international supplier relationships. A serial entrepreneur, he began his career in federal service at the Department of Defense, supporting critical-infrastructure resiliency. He co-founded GeoBitmine, where he helped develop energy-intensive compute facilities, from sourcing transformers to siting near substations, and worked with a major U.S. utility on a dynamic-load model to help nuclear plants run at a steadier, higher baseload. He speaks seven languages, including Spanish, Portuguese, Arabic and Italian.

GeoBitmineCO-FOUNDERDept. of DefenseFEDERAL SERVICE7 languagesINCL. SPANISH & PORTUGUESE

Advisors

Dr. Ben Heng
ADVISOR · FACTORY BUILD-OUT

Ben has spent his career turning new energy technology into factory production. He led solar product engineering and operations at Tesla and SolarCity, including the Solar Roof, after serving as VP of Product Engineering at Silevo, whose technology anchored the Buffalo solar factory. As COO of Caelux Solar he took a perovskite product from prototype to pilot production, and he has served as EVP of Engineering at ESS Inc., a long-duration battery manufacturer. He began at Intel, holds more than 72 patents and earned a Ph.D. in electrical engineering from the University of Illinois.

Tesla / SolarCitySOLAR ROOFCaelux SolarCOO72+PATENTS
Gene Swank
ADVISOR

Co-founder and CEO of Propellant Labs, an online startup incubator. Gene spent 15 years as a software engineer in high tech, leading aerospace and telecommunications projects, and was an early pioneer of WiMAX technology. He has founded businesses in manufacturing, technology, education and real estate.

Propellant LabsCO-FOUNDER & CEOWiMAXEARLY PIONEER
Karl V. Hopkins
ADVISOR · LEGAL & NATIONAL SECURITY

Karl is an internationally recognized lawyer in national security, international trade and energy infrastructure, now with Steptoe. He advises on foreign-investment, export-control and sanctions matters, including CFIUS, ITAR and OFAC, and on energy EPC contracting and international arbitration. He has served as incident-response counsel to a Fortune 100 energy company and as chief security officer of a large multinational, with matters in more than 50 countries. He is admitted in D.C., Texas and Virginia and as a solicitor in Ireland and England.

SteptoeNATIONAL SECURITY & TRADECFIUS · ITAR · OFACCOMPLIANCEGeorgetownM.P.S., CYBERSECURITY
Power to the people

Let's build
American.

Buying transformers, offering a building or site, or leading a community that wants a plant? We would like to talk.

Utilities, developers & communities wade@eyerlyelectrics.com