Eyerly Electrics is building a network of U.S. transformer plants, from the distribution units on every street to the large power transformers at the heart of the grid. Our supply chain is screened for China, Russia, Iran and North Korea at every tier.
power transformers
imported
supply deficit, 2025
Four-plant national build-out
Planning estimate · see the model belowTwo power-transformer, two distribution
Sites under evaluationDirect manufacturing jobs
At full production rateAdversary-nation content
Target, verified at every tierThe grid runs on transformers.
America imports them.
Every kilowatt passes through a transformer at least twice on its way to a home, a data center or a factory. Demand has more than doubled since 2019, but U.S. production has not kept up, so utilities wait years for units built overseas.
of U.S. power transformers are imported, along with about half of distribution transformers.
Wood Mackenzie, Aug 2025average lead time for a power transformer. Generator step-up units run 144 weeks.
Wood Mackenzie Q2 2025 surveygrowth in U.S. power-transformer demand since 2019. Distribution demand is up 41%.
Wood Mackenzie, Aug 2025more distribution-transformer capacity the U.S. could need by 2050, relative to 2021.
NREL, 2024The competition is already
inside the fence.
In 2025 a transformer maker headquartered in China opened a plant in Texas. Months later it underbid U.S. suppliers on a municipal tender by 20–30%.
The gap in the rules
Buy American and Build America, Buy America test where a product is made and how much of its cost is domestic. Neither asks who owns the maker. A Chinese-owned plant on U.S. soil can pass both.
Why it is a grid question
Distribution transformers sit at every service point and stay in place for 30–40 years. Who builds them is a long-dated position in U.S. critical infrastructure, taken one tender at a time.
What we offer instead
A U.S.-owned manufacturer whose suppliers are screened for links to China, Russia, Iran and North Korea, covering materials, ownership, financing, logistics and sub-tier suppliers.
Start with the street.
Scale to the substation.
We start with the distribution transformers utilities order by the thousand, then build up to the medium- and large-power units that carry the grid. Every unit is built to IEEE standards and DOE efficiency rules, and tested before it ships.
Inside a pad-mount
Drag the slider to open the unit up, then select a part to see what it does. This 37.5 kVA single-phase, loop-feed unit is our first engineering design: 24.9 kV primary, 120/240 V secondary, copper windings, and a step-lap core of grain-oriented electrical steel.
| Engineering study | 37.5 kVA pad-mount |
|---|---|
| Efficiency | 99.156% at 50% load · meets DOE 2016 and 2029 rules |
| Core | 0.23 mm Hi-B grain-oriented steel, step-lap |
| Windings | Copper only |
| Testing | 12 routine tests on every unit · IEEE C57.12.90 |
Preliminary engineering study. Units are certified and approved by the buying utility before sale.
Pole & pad, single-phase
Residential and light-commercial service, and the storm reserves every utility keeps on hand.
Three-phase pad-mount
Data centers, oilfield pads and compression, commercial campuses and substations.
Medium & large power
Substation and generator step-up units, built at our power-transformer plants once they are running.
One plant design.
Built to repeat.
Every Eyerly plant follows the same one-way flow, from rail receiving to the high-voltage test bay and out to the customer. A standard layout means we can train crews, qualify equipment and open each new plant faster than the last.
Cut & stack
Electrical steel is cut into step-lap laminations and stacked into cores.
Wind
Copper coils are wound, with paper and pressboard insulation laid in layer by layer.
Assemble
Cranes lower the coils over the core limbs to form the active part.
Dry
Heat and vacuum drive moisture out of the insulation.
Tank & fill
The active part is sealed in its tank and filled with oil under vacuum.
Test & ship
Every unit is tested, then painted and shipped by rail or truck.
Screened at every tier.
Adversaries designed out.
Latin American or allied sourcing is not automatically clean, because state-owned firms from adversary nations hold major mining and port stakes across the hemisphere. So every input carries a control written into every purchase order, and every supplier is screened again whenever ownership changes.
| Input | Where it comes from | Control on every purchase order |
|---|---|---|
| Electrical steel | U.S. and allied mills; a second domestic source is expected in about two years | Mill test certificate for each heat; mill ownership screened |
| Copper conductor | U.S. and allied producers | Mine-of-origin certificate; mines under adversary-state ownership excluded |
| Bushings, tap changers, fuses | European and U.S. manufacturers | Country-of-origin certificate by part number |
| Insulation, oil, gaskets, fasteners | U.S., allied and Americas suppliers | Sub-tier verification certificate |
| Partners | Manufacturers, mills, forwarders, ports, lenders | Ownership, financing and control screened; repeated on any change |
| Final test | Eyerly, U.S. | IEEE C57.12.90 routine tests; customer-witnessed QA; serialized origin file |
Deliver now
Units are built by an allied manufacturing partner in the Americas, using IEEE-standard designs and screened materials, then finished and tested in the U.S. The partner has already supplied about 2,000 units to a single U.S. buyer in one year.
Wind in America
Coil winding moves to the U.S. Under customs law, origin follows the most significant manufacturing step, and for a transformer that step is the core and coil.
Made in America
Our plants cut and stack cores, wind coils and test every unit in the U.S. A second domestic electrical-steel source completes the chain in 24–36 months.
What it takes to bring
transformer capacity home.
Two plant models make up the network. Distribution-transformer plants are retrofits of existing industrial buildings, so they can produce within months. Power-transformer plants add a high bay, heavy cranes and an impulse-test hall for large units. These are planning estimates, checked against recent U.S. plant announcements.
Set a budget.
See the network.
Plants are added in planned order, with distribution-transformer plants first because they can produce sooner. A shared engineering center and workforce academy ($45M, 60 jobs) comes with the second plant. Supported jobs use EPI's employment multiplier for electrical equipment manufacturing.
How the estimates compare
Recent U.S. transformer plant announcements cost $200,000–$550,000 per job. Our models come in at about $273,000 per job for distribution and $420,000 for power, because we plan to retrofit existing buildings wherever we can.
| Announcement | Product | Investment | Jobs | Type |
|---|---|---|---|---|
| Eaton · Jonesville, SC (2025) | Three-phase | $340M | 700 | Retrofit, 861k sq ft |
| Hitachi Energy · South Boston, VA (2025) | Large power | $457M | 825 | New facility |
| Howard Industries · Mississippi (2025) | Distribution | $237M | 450 | Expansion |
| Siemens Energy · Charlotte, NC (2024) | Large power | $150M | 559 | New factory, existing campus |
| Prolec GE · Goldsboro, NC (2025) | Medium power | $140M | 330+ | New building, existing site |
| Eyerly distribution-transformer plant | Distribution | $150M | 550 | Retrofit |
| Eyerly power-transformer plant | Distribution to large power | $315M | 750 | New high bay |
Sources: company and state economic-development announcements (2024–2025). Eyerly figures are planning estimates, not commitments.
We are choosing sites.
Here is what we look for.
We have not secured a site yet. We are evaluating regions where rail, power, people and steel come together, and where an existing industrial building can be put back to work. Each plant brings hundreds of permanent manufacturing jobs to its community.
A building to restart
An existing 250,000–450,000 sq ft industrial building with high clear height, or 40–80 acres of pad-ready land.
Class I rail
Rail service, or a site ready for a spur. Large units and steel coils move by rail.
Heavy-haul roads
An interstate within a few miles, on a route cleared for heavy oversize loads.
Power on the fence line
15–25 MW of service with a substation nearby, enough for drying ovens, welding and high-voltage testing.
A manufacturing workforce
A deep industrial labor pool and a regional manufacturing heritage.
A training partner
A technical or community college with electrical and mechatronics programs, so we can train coil winders and test technicians locally.
Steel in, units out
Close to domestic electrical-steel supply or a deep-water port for shipping across the hemisphere.
Ready to move
Certified or shovel-ready sites, with state and local partners who can move quickly.
Also under evaluation
Lehigh Valley, PA
Norfolk Southern and CSX, I-78 and I-476, with more than 700 manufacturers and 40,700 manufacturing jobs.
Rocky Mount, NC
CSX's Carolina Connector intermodal terminal on I-95, with the Kingsboro CSX Select megasite nearby.
Chippewa Valley, WI
A state-certified business park with a 115 kV line on site, and a technical college that trains transformer technicians.
Great Lakes Bay, MI
I-75 and Saginaw River port access, about 30,000 manufacturing jobs, and Delta College mechatronics.
Built for American demand.
Ready for the hemisphere.
Utilities, data centers and oilfield electrification are growing faster than U.S. capacity can serve them. Across the Americas, grids are being rebuilt after storms and years of underinvestment, and whoever supplies those transformers sets the equipment base for the next 40 years.
U.S. utilities
Aging fleets, storm reserves and new service connections. Utilities replace or add 1.4–2.4 million distribution transformers every year.
Data centers
Each 100 MW campus phase needs about 50 large pad-mounts, and three-phase pad-mount demand is up roughly 77% since 2019.
Oil & gas electrification
Compression, pads and processing are moving to grid power, and every new megawatt needs transformers to connect it.
Hemisphere reconstruction
Island grids hardening after storms, and nations restarting power systems for oil, mining and industry. Large units take more than two years to arrive, and today many come from China.
Deliver now.
Build as we grow.
We will not ask customers to wait for a factory. Screened units ship through our allied partner today, with U.S. content rising at each stage until every core and coil is made here. Timing is shown as targets.
Bridge
Partner-built units, finished and tested in the U.S. against standing customer demand.
Wind in the U.S.
Coil winding, dry-out and oil fill move to the U.S., making the units American-made.
First plant
The first distribution-transformer plant opens in a retrofit building and produces its first U.S.-made units.
Large units
The first power-transformer plant brings medium- and large-power capability.
Domestic steel
A second domestic electrical-steel source comes online for a U.S.-first bill of materials.
Network
Four plants at full production, with about 2,660 direct jobs.
Operators, builders,
and veterans.
People who have built companies, factories and supply chains from nothing, now putting that experience to work for American manufacturing.
Leadership
Dustin works on Eyerly’s commercial growth and supply chain. He has spent two decades taking early-stage companies from zero to scale in manufacturing, energy and industrial markets, including behind-the-meter power projects and an agricultural supply company he co-founded and sold. He is Chief Growth Officer and an equity partner at Monolith, a building-materials manufacturer, and co-author of ADAPT: A Strategic Methodology for AI Transformation. He has deep ties across the Caribbean and South America, and began his career as a U.S. Marine operator in Anbar Province, Iraq.
Dan leads Eyerly’s partnership efforts, including its international supplier relationships. A serial entrepreneur, he began his career in federal service at the Department of Defense, supporting critical-infrastructure resiliency. He co-founded GeoBitmine, where he helped develop energy-intensive compute facilities, from sourcing transformers to siting near substations, and worked with a major U.S. utility on a dynamic-load model to help nuclear plants run at a steadier, higher baseload. He speaks seven languages, including Spanish, Portuguese, Arabic and Italian.
Advisors
Ben has spent his career turning new energy technology into factory production. He led solar product engineering and operations at Tesla and SolarCity, including the Solar Roof, after serving as VP of Product Engineering at Silevo, whose technology anchored the Buffalo solar factory. As COO of Caelux Solar he took a perovskite product from prototype to pilot production, and he has served as EVP of Engineering at ESS Inc., a long-duration battery manufacturer. He began at Intel, holds more than 72 patents and earned a Ph.D. in electrical engineering from the University of Illinois.
Co-founder and CEO of Propellant Labs, an online startup incubator. Gene spent 15 years as a software engineer in high tech, leading aerospace and telecommunications projects, and was an early pioneer of WiMAX technology. He has founded businesses in manufacturing, technology, education and real estate.
Karl is an internationally recognized lawyer in national security, international trade and energy infrastructure, now with Steptoe. He advises on foreign-investment, export-control and sanctions matters, including CFIUS, ITAR and OFAC, and on energy EPC contracting and international arbitration. He has served as incident-response counsel to a Fortune 100 energy company and as chief security officer of a large multinational, with matters in more than 50 countries. He is admitted in D.C., Texas and Virginia and as a solicitor in Ireland and England.
Let's build
American.
Buying transformers, offering a building or site, or leading a community that wants a plant? We would like to talk.